Four disciplines, retained as one team
Each discipline can be appointed on its own. Together they remove the space in which cost, structure and design usually drift apart.
What a single practice changes
- One point of contact
- A single principal holds the project. You are never passed between consultants or asked to repeat the brief.
- One set of drawings
- Structural, architectural and interior information is issued as one coordinated set, so the builder is never working from conflicting documents.
- One programme
- Design, planning, procurement and construction are planned as a single sequence rather than four separate ones.
What a London house asks first
- Listed buildings and conservation areas
- Listed building consent and conservation area controls can decide what is altered, and in which material. They are best understood before the design is fixed.
- Party walls and neighbours
- Work to a shared wall, and some excavation close to a neighbouring building, requires notice under the Party Wall etc. Act 1996. It belongs in the programme from the start.
- Basements and excavation
- Ground conditions, groundwater, temporary works and borough basement policy shape both feasibility and cost.
- Building Regulations dutyholders
- In England, homeowners, designers and contractors have defined duties, including the principal designer and principal contractor roles where more than one contractor is involved. Each role should be clear before work begins.
Feasibility, planning, structural design, technical drawings, procurement, contract administration and interior specification. Where a project needs a specialist we do not hold in house, we say so and bring them in under our coordination.
The scope and fee for each stage are set out in writing after the consultation, once the project is properly understood.
Begin with the consultation